[ad_1]
The situation from the heavy snowfall has worsened in Bulqiza.
As a result, the administrative unit of Trebisht and a part of the villages of Zerqan, Ostren were blocked because the thickness of the snow exceeded 40 cm.
The rains started in the early hours of the morning. The Arbri road from Peshkopia to Klos is crossed with chains, while the bypass in Qafën e Murrizit is blocked, while the road construction company is working with 4 snowplows to open it.
Axis Peshkopi – Kala e Dodës – Kukës the crossing is done with chains.
Axis Peshkopi – Draj Reç – Kukës crossing is done with chains.
Axis Dibër – Librazhd crossing is done only with chains.
During the night there was no electricity shortage in any of the remote areas.
top channel
[ad_2]
Source link