[ad_1]
The new Divjaka hydropower plant is already operational and will guarantee drainage at any time of around 1400 ha of agricultural land.
The Prime Minister of the country, Edi Rama has posted on the social network “Facebook” the images from the new hydropower plant, which he says has been built and equipped with the latest generation electromechanics.
top channel
[ad_2]
Source link