[ad_1]
The rains of the last two days of rain accompanied by snow have brought problems in the bypass axis of Arbri road in Qaf Murriz.
In this road axis there was a side slip of the road, blocking the circulation of vehicles in the direction of Tirana and vice versa.
The contracting firm is continuing with the works for unblocking the road and facilitating the traffic.
top channel
[ad_2]
Source link












